Curve sliding: Difference between revisions

From Cybis Wiki
Jump to navigation Jump to search
No edit summary
No edit summary
Line 9: Line 9:
<br/>Plot your scores, one for each step, and it may look as the picture above.
<br/>Plot your scores, one for each step, and it may look as the picture above.
As you can see there is only one high peak. This occurs when the two curves lay over each other with their very first years overlapping. In real world this means that the two logs were cut the same year.
As you can see there is only one high peak. This occurs when the two curves lay over each other with their very first years overlapping. In real world this means that the two logs were cut the same year.
==Overlap==
When you start sliding the red curve from left to right over the black curve, there are at first only a short part of the curves that "overlap".
To look at how one or two or even five rings match is not meaningfull. A reasonable value for a minimum overlap is 30.
So probably you should start with the two curves overlapping 30 years and then calculate
your score values from that point and on while you successively slide the red curve over the black one.
In CDendro the minimum overlap can be set through the command "Settings/Options for matching and normalization/Least overlap in years between samples when correlating"

Revision as of 12:07, 30 June 2009

Curvesliding.gif
The process of crossdating implies comparing two curves with each other and trying to find where they fit together.

Here, the red curve is shifted stepwise from left to right along the black curve. For each step we try to quantify how well the red and black curves fit together at that point.

Let the curves lay over each other on a table with the red curve plotted on transparent paper. After looking at the mismatch you can set up a score telling how bad it all looks. Then shift the upper curve one step (one year) to the right and set up a second score for this mismatch. While stepping and scoring you suddenly see - if you are lucky - a really good match which will give a high score.

Corrcoeffpiled.gif
Plot your scores, one for each step, and it may look as the picture above. As you can see there is only one high peak. This occurs when the two curves lay over each other with their very first years overlapping. In real world this means that the two logs were cut the same year.

Overlap

When you start sliding the red curve from left to right over the black curve, there are at first only a short part of the curves that "overlap". To look at how one or two or even five rings match is not meaningfull. A reasonable value for a minimum overlap is 30. So probably you should start with the two curves overlapping 30 years and then calculate your score values from that point and on while you successively slide the red curve over the black one.

In CDendro the minimum overlap can be set through the command "Settings/Options for matching and normalization/Least overlap in years between samples when correlating"